Our building process

These are what we consider to be the three main phases of any project. Each of these stages receives the same level of scrutiny and detailed attention to ensure a smooth transition between the phases.

We have created this philosophy as the backbone of our standard construction model and we ensure that it forms the foundation of every project we undertake. However, it remains fully flexible to adapt to any aspect of our clients’ bespoke requirements.

We are always happy to meet prospective clients without charge to offer straightforward building advice and an idea of cost.

 
The-Steps-to-Construction.png
 
Step-1.png

Planning

We believe the principles of good planning remain constant. In addition to detailed planning we believe our considerable building experience will ensure that the design of any building works together with any associated constraints make for a successful project.

 
STEP 2.jpg

Building

The most important part of any project is delivering our client an unrivalled level of service, care and consideration. To execute a project in this manner, maintaining outstanding value for money and delivering a level of craftsmanship that surpasses other builders in our sector can only come through employing the best tradesmen, careful buying, minimising waste and complete efficiency throughout the planning stage.

We have found that by adopting this philosophy generally reduces the stress and inconvenience of having building work carried out, as well as giving the most pleasing end result. Where possible we try to source local materials and we use sustainable timber.

 
STEP 3.jpg

Finishing

We guarantee our work and there is a commitment to resolve any issues that may arise as quickly as possible, with the minimum fuss. All of our work is inspected and signed off, either by the local authority building inspector, or by another suitably qualified specialist organisation.

Furthermore, as part of the handover process our project manager will provide a file containing all guarantee paperwork, copies of finishing schedules and will also provide training on equipment and appliances installed if necessary.